Reference site 5 for metro transport

“Sofia Subway Expansion Project: Third Metro - Botevgradsko Shose Depot - Vladimir Vazov Blvd. - Central City - Ovcha Kupel, First Stage”

“Sofia Subway Expansion Project: Third Metro - Botevgradsko Shose Depot - Vladimir Vazov Blvd. - Central City - Ovcha Kupel, First Stage”


Section 4: „From km  4 + 320 km 4 + 950 with one metro station ”(MS 5);


Section 3: “Lot 3 - section from km 6 + 561.05 (end of MS 8) to km 4 + 950 with 2 metro stations and tunnel section."


Investor: “Metropoliten” PLC
Client: “Trace-Sofia” PLC
Location: Sofia
Period of realization: September, 2018– December, 2019
Role of “Avis Engineering” Ltd.: Subcontractor
Nature of the works:
        - Assembly of  Rigid catenary;
        - Installation of power supply for contact network;
        -  Laying cables.