“Sofia Subway Expansion Project: Third Metro - Botevgradsko Shose Depot - Vladimir Vazov Blvd. - Central City - Ovcha Kupel, First Stage”
Section 4: „From km 4 + 320 km 4 + 950 with one metro station ”(MS 5);
Section 3: “Lot 3 - section from km 6 + 561.05 (end of MS 8) to km 4 + 950 with 2 metro stations and tunnel section."
Investor: “Metropoliten” PLC Client: “Trace-Sofia” PLC Location: Sofia Period of realization: September, 2018– December, 2019 Role of “Avis Engineering” Ltd.: Subcontractor Nature of the works: - Assembly of Rigid catenary; - Installation of power supply for contact network; - Laying cables.